langage grossier - significado y definición. Qué es langage grossier
Diclib.com
Diccionario ChatGPT
Ingrese una palabra o frase en cualquier idioma 👆
Idioma:

Traducción y análisis de palabras por inteligencia artificial ChatGPT

En esta página puede obtener un análisis detallado de una palabra o frase, producido utilizando la mejor tecnología de inteligencia artificial hasta la fecha:

  • cómo se usa la palabra
  • frecuencia de uso
  • se utiliza con más frecuencia en el habla oral o escrita
  • opciones de traducción
  • ejemplos de uso (varias frases con traducción)
  • etimología

Qué (quién) es langage grossier - definición

COMBINED-CYCLE POWER PLANT
Langage power station

Nicolas Ruwet         
BELGIAN MUSICOLOGIST
Ruwet; Language, musique, poesie; Langage, musique, poesie; Langage, musique, poésie; Language, musique, poésie
Nicolas Ruwet (December 31, 1932 – November 15, 2001) was a linguist, literary critic and musical analyst. He was involved with the development of generative grammar.
Calcaire Grossier d'Etrechy         
The Calcaire Grossier d'Etrechy is a geologic formation in France. It preserves fossils dating back to the Paleogene period.
Specification and Description Language         
ITU-SPECIFIED SYSTEM DESCRIPTION LANGUAGE
Specification and Design Language; Langage de description et de spécification; List of SDL tools; SDL-RT
Specification and Description Language (SDL) is a specification language targeted at the unambiguous specification and description of the behaviour of reactive and distributed systems.

Wikipedia

Langage Power Station

Langage Power Station is a combined-cycle power plant near the city of Plymouth in Devon, England.

Centrica, owners of the site, announced on 16 June 2006 that the natural gas fired power station was to be constructed on their behalf by Alstom. Section 36 consent was granted in 2000 and Reserved Matters were approved in 2005. The 885 MW plant was expected to cost £400 million and to start generating in early 2009, but problems with internal pipework pushed this back. The power station was completed and operations started in March 2010.

Langage was set to be the first fossil fuel power station built in the UK since 2005, but due to delays it was preceded by Marchwood Power Station, which was commissioned in 2009. Multiple other CCGT stations were also commissioned around this time, including Pembroke Power Station and West Burton B. The station was commissioned against an expected 'energy gap' in UK generating capacity, caused by the expected closure of nuclear and older coal-fired stations.

The power station had permission to build three gas-powered turbines when it bought the site in 2004, but due to land constraints they were only able to build two.

The plant uses two Alstom GT26 gas turbines, each driving an air-cooled turbogenerator, with a heat recovery steam generator powering a single STF30C steam turbine which also drives another air-cooled turbogenerator.

Centrica put the plant up for sale in May 2014, stating an aim to invest in smaller, more flexible power stations. On 21 June 2017, Centrica agreed to sell the power station to EP UK Investments as part of a deal that also saw South Humber Bank CCGT power station change hands between the two companies. EP UK Investments is the daughter company of EP Power Europe, which is 100% owned by Czech energy group EPH (owned by Daniel Křetínský).

The UK high pressure national gas pipeline network (the National Transmission System) was extended to Plymouth in 1989 (Feeder No.20 terminates at an Above Ground Installation (AGI) south of Smithaleigh). Langage Power Station was built to exploit the availability of high pressure gas and the station now represents the southernmost gas-fired station on the network.